21,000 sq ft The seismic strengthening of the prevailing theater building incorporated the addition of two attribute stairs to a new balcony stage, a sunken screening space with curved acoustic panel ceiling and a different elevator to the seating location even though preserving the present historic plaster inside walls and ceiling.

Concentrating the bulk with the structural Functioning within the new design substantially lowered the overall price of the task.

one hundred ten foot diameter Having a nod towards traditional civic initiatives that are determined with domes, the San Jose Civic Center encompasses a 100-foot open rotunda capped by a modern interpretation of the dome. The rotunda serves as an open-air gathering and general public performance Place. The dome supports a tension grid glass pores and skin plus a moveable sunscreen that tracks the Sunshine during the day.

 The structural procedure is precast columns, prestressed girders, conventionally bolstered concrete slabs, and shotcrete perimeter partitions. Impressive mechanical method structure needed close coordination amongst one other disciplines, the structural style, along with the shoring method supporting the approximately one hundred-foot excavation as well as adjacent San Diego Freeway. Our business also served given that the parking expert for this venture.

 The combination of the wind tunnel research and the dual lateral technique lowered the overall metal tonnage to 12.five lbs . for every square foot. Within the 7-story parking structure, making use of long-span girders along with a lateral system of all instant frames eliminated columns involving parking stalls and improved visibility during the wikipedia reference garage. The venture is LEED Gold Accredited.

Whittier, CA

The setting up design consisted of structural metal framing with bolstered masonry shear partitions. Parts of the existing building exterior masonry walls experienced to remain as part of a Metropolis prerequisite for the undertaking.

We worked intently Along with the contractor to build techniques to hurry up the ask for for data and shop drawing submittals. We had numerous submittals for Basis, lateral system and full design document to help you the contractor fulfill the task routine.

Our advice was presented into the Tall Structures Council for their critique and approval and Due to this fact, the City of Santa Monica is applying our development of this effectiveness-primarily based standard on other rehabilitation assignments about his within their Metropolis.

Without the need of total demolition with the bleacher framework, the initial “Wooden” pile Basis was retained.

 The concrete constructions are made with flat plate slabs and central concrete Main shear partitions to maximize ceiling heights and supply greatest adaptability for tenants and inhabitants his explanation alike. The central Main area has also permitted for intricate architectural schemes which have been the building perimeter considering the fact that there's no interference from the construction. Superbly landscaped plaza places with highly flexible tenant Areas, as well as sufficient parking, offer for a vivid and stylish resident daily life in this advanced.

 Employing a flat plate post tensioned concrete framing for that apartment and parking flooring assist decrease the structural flooring thickness need to eight″. Making use of prestressed precast planks supported by beams during the professional place let the flexibleness of much easier renovation from the Areas Later on.

We done a seismic evaluation in the 1940’s and previously buildings and decided that some added rehabilitation was needed mostly for wall to flooring connections from the 1920’s structures.